500 kV Tr.Line (Double Circuit ,4 Bundle Conductor)
CLIENT CONTRACT NO VOLTAGE (kV) CONDUCTOR EARTHWIRE OPGW TOWER SERIES LOCATION LENGTH (km)
Projects Completed
TNB AM 53/0506 500 Curlew - - 45 Emergency Replacement of damaged conductors for 500kV Transmission Line PGGS-PMJY 0.5
ABB Zelleco Consortium 241/95 500 Curlew - 2x24 fiber 45 Stringing of 4xCurlew 500 kV Transmission line for Line 2                 ((Phase I &I A-Line 2) 500kV TransmissionLine  (Bukit Tarek to Ayer Tawar) 30
Transmission Technology 241/95 500 Curlew - 2x24 fiber 45 Stringing of 4xCurlew 500 kV Transmission line for Line 5 and 6 of 500kV TransmissionLine Phase 1 and 1A 15
Zelleco Hyundai JV 241/95 500 Curlew - - 45 500 kV Double Circuit 4 x Curlew Transmission Line -3  from Ayer Tawar to Junjong 49
TOTAL LENGTH 94.5

275/132 kV Tr.Line (Quadruple Circuit ,Twin Bundle Conductor)
CLIENT CONTRACT NO VOLTAGE (kV) CONDUCTOR EARTHWIRE OPGW TOWER SERIES LOCATION LENGTH (km)
Projects Completed
Powertek Berhad PR/HQ
/TENDER
/01:0001/
2001
275/
132kV
Zebra, Batang Skunk 2x24 fiber 2423 Implementation of 275kV Double Circuit and 275/132 kV Quadrauple Transmission line from Power tek S/S to Kelemak S/S 275/132 kV Transmission Line from Kelemak SS to Point A 16
Mahkota Technolgs DN 2/2000 275,132 Bison Skunk 24 fiber 275/132 Sabah West Coast Grid Extension Project-Supply & LTE Works 1.2
TNB 877/97 275/132 Zebra/Batang Skunk 18 fiber 2423 Supply &  Erect 275 kV & 132 kV Transmission Lines for TNB Transmission System Development Mainhead A & C 5.0
TNB  1366/95 275/132 Zebra/Batang Skunk 10 fibre 2423 Supply and Installation of 275 kV and 132 kV Transmission Lines Mainhead B 20.0
TNB 1187/95 275/132 Zebra/Batang Skunk 10 fibre 2423 TNB  Transmission System Development Satge-1-1995 ,Package-7 16.0
TNB 848/93 275/132 Zebra/Batang Skunk 10 fibre 2423 Northern Area Transmission Development stage 2 ,275 kV and 132 kV Transmission lines 17.0
TOTAL LENGTH 75.2

132 kV Tr.Line (Double Circuit , Twin Bundle Conductor)
CLIENT CONTRACT NO VOLTAGE (kV) CONDUCTOR EARTHWIRE OPGW TOWER SERIES LOCATION LENGTH (km)
Projects Ongoing
TNB 707/2007 132 Batang Skunk 24 fiber 23 Upgradation of 132KV Double Circuit Transmission Line from Bukit Beruntung to Slim River 61.00
TNB 102/2009 132 Batang Skunk 24 fiber 23 132KV Double Circuit Transmission Line from Papan to Meglambu  6.80
TOTAL LENGTH 67.80
Projects Completed
TNB 851/2006 132 1 x Batang Skunk  24 fiber 23 132KV Double Circuit Transmission Line from Point X (AP26A) to PPU Tanju Gemok substation (Total line length 30.0Km, 21.0 Km completed & TOC received)  9.00
TNB 833/2006 132 1 x Batang Skunk  24 fiber 23 132KV Double Circuit Transmission Line from PMU Mersing 132/33KV to Point X (AP26A) including extension of 132KV Terminal Bays at MPU Mersing & PPU Tanju Gemok substations 29.25
TNB 277/2000 132 Batang Skunk  24 fiber 23 Rehabilitation Project for 132kV Transmission Line Package 2 Perak Darul Ridzuan - 1999 30
Mahkota Technologies DN 2/2000 275132
,275/132
Bison Skunk 24 fiber 132 Sabah West Coast Grid Extension Project-Supply & LTE Works 64
TNB 146/2000 132 Batang Skunk 24 fiber 23 Implementation of 132 kV Double Circuit Transmission Line from Point "X" to Avetani Substation, Pahang 10
TNB 255/98 132 Batang Skunk 18 fiber 23 Implementation of 275 kV & 132 kV Transmission Line Projects for tarnsmission System development 1997-Stage 2 Mainhead 'D" 56
            23 Loop in/out Harta Kemuncak 2.0
            23 Seelong - Bkt Batu 51.0
TNB 877/97           Supply &  Erect 275 kV & 132 kV Transmission Lines for TNB Transmission System Development Mainhead A & C 72.0
TNB  1366/95           Supply and Installation of 275 kV and 132 kV Transmission Lines Mainhead B 4.5
    132/132 Batang Skunk 10 fibre 2323 Paroi - Jalan Kilat 7.0
TNB 1328/95 132 Batang Skunk 18 fibre 23 Double Circuit Transmission line from Jor Power Station to
Bintang Substation ,Cameroon Highland,Pahang Darul Makmur,Stage -1 
9.0
TNB 1187/95 132 Batang Skunk 10 fibre 23 TNB  Transmission System Development Satge-1-1995 ,Package-7 29.0
Permatang Tok Bidan - Bedong
TNB 590/95 132 Batang Skunk 10 fibre 23 Implementation of Transmission line project in TNB system-Mainhead F 63.3
TNB 373/95 132 Batang Skunk 10 fibre 23 Looping into Pahang Cement Plant (Stage1) 26.0
TNB 527/95 132 Batang Skunk 10 fibre 23 Looping into Pahang Cement Plant (Stage2) 17.0
UEM - 132 Batang Skunk - - Relocation of Towers at Shah Alam 0.6
TNB 374/95 132 Batang Skunk 10 fibre 23 Kg Pertang - Simpang Pertang 8.5
TNB 197/95 132 Batang Skunk 10 fibre 23 Looping into Temerloh Industrial Park 11.0
TNB 666/95 132 Wolf Skunk - 13/23 Nilai - KTM Batang Benar 2.0
TNB 677/94 132 Batang Skunk 10 fibre 23 132 kV Double circuit 2 x 300 MM2 Transmission Line Bukit Tinggi Resort & Cita Wajar, Pahang 9.5
TNB 641/93 132 Batang Skunk 10 fibre 23 Kulim Hitech  - Bedong 45.0
    132 Batang Skunk - 23 Bedong Termination 2.0
TNB 242/92 132 Batang Skunk - 23 Kuala Krai - Gua Musang 113.0
TNB 211/92 132 Batang Skunk - 23 Segamat - Kuala Pillah 98.0
TNB 39/92 132 Batang Skunk - 23 Looping into Desaru 8.5
TNB 694/91 132 Batang Skunk - 23 Tramsmission Development 132 kV Transmission Line Mainhead  D&E 129.5
IRCON - 132 Batang Skunk - 23 Deviation of line at Subang Jaya 0.7
TNB 440/89 132 Batang Skunk - 23 Segamat - Yong Peng 83
              Segamat (New) - Segamat (Old) 7
TOTAL LENGTHf 959.1

275kV TRANSMISSION LINES
CLIENT CONTRACT NO VOLTAGE (kV) CONDUCTOR EARTHWIRE OPGW TOWER SERIES LOCATION LENGTH (km)
Projects Completed
TNB 1187/95 275 2 x Zebra Skunk 10 fibre 24 TNB Transmission System Development Stage 1-1995 Package 7 (V.0 No. 2)  6.0
Powertek Berhad PR/HQ/TENDER
/01:0001/2001
275kV       24 Implementation of 275kV Double Circuit and 275/132 kV Quadrauple Transmission line from Power tek S/S to Kelemak S/S  
275kV Line from Powertek to Point A 7
TNBE 2/2001 275 2 x Zebra Skunk 24 fiber 24 275kV Transmission Line Deviation at Greater Kuantan Water Supply Project Phase 2, Sg. Cereh Dam 7
Mahkota Technologies DN 2/2000 275,132, 275/132 Bison Skunk 24 fiber   Sabah West Coast Grid Extension Project-Supply & LTE Works  
          275 Powertron S/S-Kota Belud S/S-Simpang Mangaris S/S. 110
TNB 877/97 275 2 x Zebra Skunk 18 fiber 24 Supply &  Erect 275 kV & 132 kV Transmission Lines for TNB Transmission System Development Mainhead A & C 93.0
TNB  1366/95 275 2 x Zebra Skunk 10 fibre 24 Supply and Installation of 275 kV and 132 kV Transmission Lines Mainhead B 15.0
UEM - 275 Zebra Skunk 18 fibre - Relocation of Towers at Nilai 1.5
TNB 848/93 275  2 x Zebra Skunk 10 fibre 24 Northern Area Transmission Development stage 2 ,275 kV and 132 kV Transmission lines 9.0
TNB 310/2005 275 kV 3 x Zebra Skunk 24 FIBER 34 275 kV (1000 MVA) Transmission Line from Paroi to Lenggeng -using 3 bundle conductor 27.6
TNB 20/2005 275 kV 3 x Zebra Skunk 24 FIBER 34 275 kV High Capacity Transmission Line Bukit Rajah-Shah Alam (West) -using 3 bundle conductor
7
TOTAL LENGTH 283.1

33 kV Tr.Line (Single Circuit , Single Conductor)
CLIENT CONTRACT NO VOLTAGE (kV) CONDUCTOR EARTHWIRE OPGW TOWER SERIES LOCATION LENGTH (km)
Projects Completed
Mahkota Technologies DN2/2000 33 Panther Skunk 18 fiber 33 Simpang Mangaris S/S -Marudu S/S. 8.5
SESB, Sabah T 3927 33 Batang Skunk 18 fiber 1212 33 kV interconnection between Sandakan 132/33 and Taman Tsun Nyen Substation 7
TNB 300/98 33 Ash       Implementation of 33 kV Distribution Lines Project for Pahang Darul Makmur Stage 1-1998. 25
TNB 116/96 33 Ash   - Pole Pasak - Tenggaroh 63
TOTAL LENGTH 103.5

SUBSTATION PROJECTS
CLIENT CONTRACT NO VOLTAGE (kV) TRANSFORMER NO. OF BAYS S/S BUILDING LOCATION
Projects Ongoing
TNB 458/2006 132/11 2X30MVA 4 New                  2½ STOREY Supply ,Erect and Commissioning of 132 kV switchgears, 2X30MVA Transformers and Ancillary Equipment complete with associated civil works at ITC Bentong Substation (Stage - 1 & 2 completed accounting 95% of total contract, balance 5% scheduled in Aug'09)
TNB 251/2008 132 & 275 - Refurbishment of primary equipment - Replacement and Refurbishment of equipment for PMU Lower Piah 132KV, PMU Upper Piah 132KV, PMU Grik 275KV and PMU Papan 132KV
TNB 17/2009 132 & 275 - Refurbishment of primary equipment - Supply, Erect of Selected 275KV & 132KV Equipment "Replacement and Refurbishment Equipment" for Asset Maintenance - MH 'E'
Projects Completed
TNB 482/2005 132/11 - 4 - Supply ,Erect and Commissioning of 132 kV switchgears and Ancillary Equipment complete with associated civil works at Dungun and Chendering Substations 
TNB 1021/97 132/11 - 11 New             1½ STOREY Supply ,Erect of 132 kV & 11 kV Switchgears,Ancillaries and associated civil works for TNB Transmission system development 1997,Mainhaed 'B'

AIRCRAFT WARNING LIGHTS INSTALLATION
CLIENT CONTRACT NO SYSTEM VOLTAGE (V) POWER SOURCE TYPE OF LANTERN OPERATION CYCLE NO. OF SYSTEMS SUPPLIED LOCATION
Projects Completed
TNB 83/2004 12 Solar Powered LED Type (RED) 12 Hrs Night Time 24 Supply and Installation of Aircraft Warning Lights on 132 kV Transmission lines.
TNB 641/2001 12 Solar Powered Xenon Flash Tube 24 Hrs Day/Night 170 Supply and Install 171 unitsAircraft Warning Lights for TNB Transmission Lines
TNB 16/2000 24 Solar Powered 6 Lamp Changer 12 Hrs Night Time 75 Supply of Air Naviation System for 500 kV Transmission line from Ayer Tawar Substation to TNB Tanamanjung Power Station

INSTALLATION OF ADSS
CLIENT CONTRACT NO VOLTAGE (kV) CONDUCTOR EARTHWIRE OPGW TOWER SERIES LOCATION LENGTH (km)
Projects Completed
TNB 489/2000 132 - - OPGW/ADSS   Enhancement of TNB's Digital Transmission and Protection System - Phase 1 230
          24 fiber   Installation of OPGW and ADSS fiber Optic cable on transmission line under live line conditions  
Pirelli  -  220  -   -   -   -   Install of ADSS cable under single side outage in collaboration with Steel Products Ltd,India   400
 Fibercomm   1.96 LOI 4   -   -   -   48 fiber   -   Install ADSS 275kV & 132kV lines  265
Fibercomm 1.96 LOI 2 - - - 48 fiber - Install ADSS 275kV & 132kV lines 215
TOTAL LENGTH 1110.0


INSTALLATION OF OPGW
CLIENT CONTRACT NO VOLTAGE (kV) CONDUCTOR EARTHWIRE OPGW TOWER SERIES LOCATION LENGTH (km)
Projects Completed
TNB 191/2003 275 kV - - 24 FIBER - Enhancement of TNB's Digital Transmission and Protection System - Phase 2 697
              Installation of OPGW on double circuit transmission line under FULL live line conditions  
TNB 489/2000 132 - - OPGW/ADSS 23,13, Enhancement of TNB's Digital Transmission and Protection System - Phase 1 700
          24 fiber others Installation of OPGW and ADSS fiber Optic cable on transmission line under live line conditions  
TNB 1051/97 132 - - 18 fiber - Supply and Installation of Optical Fibre Cable on 132 kV Transmission Lines from Kuala Lumpur (South) to Bandar Tun razak Substation in Live Condition 7.5
SESB, Sabah T 4207           Dismantling of 1 x Skunk Earthwire (70 mm²) abd Installation of 1 x 18 SMF OPGW 132 kV Tarnsmission Line Penampang-Tenom-Keningau. 170
Pirelli              Install of OPGW cable under single side outage in collaboration with Steel Products Ltd,India   400
TNB 480/94 - - - 18 fibre - TJPS - Serdang (OPGW only) 60.0
TOTAL LENGTH 2034.5

Please contact us for the detailed track records.

 